Case Studies at Ventro

At Ventro, we take pride in our work, here are just a few examples of the work we have done to ensure fire compliance.

Social Housing

Sovereign Housing

A programme of certified fire door replacements based on initial surveys conducted by our in-house team of passive fire surveyors.

Read more

Chesterfield Borough Council

Chesterfield was first notified of potential compartmentation issues by their surveying team in early 2019. They required Ventro’s services to help.

Read more

Melton Borough Council

The Fire and Rescue Service (FRS) identified possible issues with the emergency lighting and fire alarm systems in one of Melton Borough Council’s sheltered schemes.

Read more

Rochdale Borough Housing

The housing provider appointed Ventro to undertake the replacement of 410 flat entrance doors and fire stopping across 19 blocks of general needs flats.

Read more

Rykneld Homes

Rykneld Homes had 12 buildings in 5 different locations that needed FD30 door installation, as well as tasks such as installing fire-rated intumescent mastic.

Read more

Healthcare

North West Anglia NHS

Hinchingbrooke Hospital required extensive fire safety remedial works to ensure compliance and enhance the safety of its premises.

Read more

Hamberley Care Homes

Works which were identified by the local fire service needed to be completed swiftly to make sure that the care home complied with the latest legislation.

Read more

Education

Education-White

 

There was discovery that the alarm systems in five of their schools were outdated and no longer adequate. Ventro Group was appointed as principal designer for the new installation.

Want to learn more about our Case Studies?
Get in touch today.