Case Studies at Ventro
At Ventro, we take pride in our work, here are just a few examples of the work we have done to ensure fire compliance.Refine Case Studies by category
All Case Studies
Social Housing
Sovereign Housing
A programme of certified fire door replacements based on initial surveys conducted by our in-house team of passive fire surveyors.
Read moreChesterfield Borough Council
Chesterfield was first notified of potential compartmentation issues by their surveying team in early 2019. They required Ventro’s services to help.
Read moreMelton Borough Council
The Fire and Rescue Service (FRS) identified possible issues with the emergency lighting and fire alarm systems in one of Melton Borough Council’s sheltered schemes.
Read moreRochdale Borough Housing
The housing provider appointed Ventro to undertake the replacement of 410 flat entrance doors and fire stopping across 19 blocks of general needs flats.
Read moreRykneld Homes
Rykneld Homes had 12 buildings in 5 different locations that needed FD30 door installation, as well as tasks such as installing fire-rated intumescent mastic.
Read moreHealthcare
North West Anglia NHS
Hinchingbrooke Hospital required extensive fire safety remedial works to ensure compliance and enhance the safety of its premises.
Read moreHamberley Care Homes
Works which were identified by the local fire service needed to be completed swiftly to make sure that the care home complied with the latest legislation.
Read moreLuton & Dunstable NHS
Luton & Dunstable Hospital identified the need for a fire door replacement programme following a fire door survey conducted by an external company.
Read moreEducation
Hertfordshire County Council
There was discovery that the alarm systems in five of their schools were outdated and no longer adequate. Ventro were appointed as principle designer.
Read more