Case Studies at Ventro
At Ventro, we take pride in our work, here are just a few examples of the work we have done to ensure fire compliance.Refine Case Studies by category
All Case Studies
Social Housing

Sovereign Housing
A programme of certified fire door replacements based on initial surveys conducted by our in-house team of passive fire surveyors.
Read more
Chesterfield Borough Council
Chesterfield was first notified of potential compartmentation issues by their surveying team in early 2019. They required Ventro’s services to help.
Read more
Melton Borough Council
The Fire and Rescue Service (FRS) identified possible issues with the emergency lighting and fire alarm systems in one of Melton Borough Council’s sheltered schemes.
Read more
Rochdale Borough Housing
The housing provider appointed Ventro to undertake the replacement of 410 flat entrance doors and fire stopping across 19 blocks of general needs flats.
Read more
Rykneld Homes
Rykneld Homes had 12 buildings in 5 different locations that needed FD30 door installation, as well as tasks such as installing fire-rated intumescent mastic.
Read more
Greatwell Homes
Ventro Group manages Active fire safety assets on behalf of Greatwell Homes for 11 properties within their assisted living portfolio.
Read moreHealthcare

North West Anglia NHS
Hinchingbrooke Hospital required extensive fire safety remedial works to ensure compliance and enhance the safety of its premises.
Read more
Hamberley Care Homes
Works which were identified by the local fire service needed to be completed swiftly to make sure that the care home complied with the latest legislation.
Read more
Luton & Dunstable NHS
Luton & Dunstable Hospital identified the need for a fire door replacement programme following a fire door survey conducted by an external company.
Read moreEducation

Hertfordshire County Council
There was discovery that the alarm systems in five of their schools were outdated and no longer adequate. Ventro were appointed as principle designer.
Read more